Architectural Review Board (ARB)

The SOA Architectural Review Department (ARB) is made up of an Administrator and a Compliance Officer.  The Administrator receives all pertinent information needed for the review process for any new construction or modifications and ensures all items are in order for the biweekly meetings with the Review Board.

The Compliance Officer works in the community to review new construction and modifications to ensure they are being done in accordance with the approved plans.  Contact information for both staff members is below.  

Mae Harless, ARB Administrator(850) 424-5930mharless@soaowners.com or arb@soaowners.com
Micah Priest, Compliance Officer(850) 424-5931mpriest@soaowners.com
Darlene Sholler, ARB Staff Support(850) 424-5931dsholler@soaowners.com

****************************************************************************
Department Objective
The Architectural Review Board, or ARB, was established to define and interpret aesthetic standards in Sandestin. The ARB either approves, or disapproves, any and all proposed vertical, or horizontal improvements for commercial, or residential building sites in Sandestin.

ARB approval must be obtained for any project, including, but not limited to commercial or residential dwellings, garages, any type of outbuilding, landscaping, yard art, fences/walls, decks, terraces, patios, courtyards, sidewalks, driveways, parking areas, signs, mailboxes, improvements, and colors of any exterior surface or material.

ARB Process
The Board is made up of a minimum of five homeowners, a consulting architect, and a landscape architect. Plans/applications to be considered by the ARB are required to be submitted by 5 pm the Monday a week prior to the ARB meeting. The schedule for the current year's meetings can be found on the Calendar page of this web site.

Technical meetings are held on the Wednesday, a week prior to the ARB meetings with the Consulting Architect and Landscape Architect.  With their recommendations, the remaining Board members meet to review the submittals for consideration. To view a calendar of when Tech meets along with submittal deadlines please click here.

The ARB Administrator, then advises of the Board’s decision via a letter. The Guidelines allow for up to 10 calendar days for the decision to be provided, however, it is usually available within 5 business days.

The Committee is governed by Architectural Review Board Guidelines, which can be viewed in PDF format by clicking on the link below. If you would like a copy mailed to you, please call our office at (850) 424-5930 or you can stop by our office and pick one up.

It is the owners responsibility to ensure that the contractor they hire has a current FL Contracting License that permits them to perform the work in which they are to complete. Below is some helpful information regarding FL contractor license requirements.
FL Contractor License
Obtaining permit as Owner/Builder                

                                            

Neighborhood Association Supplemental Guidelines
(Also see full SOA ARB Guidelines below)

The following Guidelines have been established by the HOA/COA  as Supplemental Guidelines with information that pertains solely to each respective Neighbhorhood Association. If your neighborhood is listed below, please be sure to refer to both the Supplemental Guidelines and the SOA ARB Guidelines. 

Bay Pines 5/2017Bungalos 5/2012
Burnt Pine East 6/21/2012 (Rev.3.25.14)Crystal Lake 12/2011
Deerwood 11/2011Delmar 12/2011
Fountains Rev 10/2017Grand Harbour 1/2012
Harbour Point 11/2011Prestwick Place 3/2017
St. Andrews 12/2011 Vineyards 2/23/12
Section X Excerpt from 2010 ARB Guidelines, includes specific information for Burnt Pine, Laurel Grove, Raven Oaks, Tivoli Ridge, Island Estates and Tuscana.

 

Neighborhood Association Guidelines  - (Also see full SOA ARB Guidelines below)

The following neighborhoods have established Architectural authority in their association governing documents.  Please note, there may be other neighborhoods that have Architectural authority per their governing documents; however, the SOA has not been provided a copy of any approved Guidelines.  If you are not certain if your neighborhood has Guidelines, please contact your Association Manager.  For previous versions of the Guidelines, please contact your Association Manager.
(Neighborhood Association Management)

Genoa Rev. 9/2017Villa Lago Rev. 3.2012
L'Atrium  12/2015 

 

ARB Forms

ARB
Title File
Hurricane Shutter Policy Download form
Open House Rules and Sign Specifications Download form
Landscape Maintenance Standards - Revised 5/18/2017 Download form
Architectural Guidelines Approved 12.2014 - Rev. 6.2015 Download form
New Construction Application 2015 Download form
New Construction Landscape.Hardscape Application 2015 Download form
Exterior Modification Application 2015 Download form
Variance Request Form 2015 Download form
Summary of Contractor Rules and Standards Download form
ARB Submittal Flowchart Download form

Frequently Asked Questions

Why do I need ARB approval for new construction & exterior modifications?

To maintain Sandestin’s commitment to quality and consistency within a given area or neighborhood environment, and to create a superior living environment for generations to come through the preservation of the architectural motif and natural character of the community.

Do I need ARB approval for landscaping?

 All exterior modifications, including landscaping, fountains, patios, and statues require an approval from the ARB prior to implementation.

When do I need to submit my project for ARB review?

All submittals should be in the ARB office by close of business on the Monday a week prior to the meeting. Meetings are held every other Wednesday.  See our calendar link for specific dates.  

When will I receive my decision?

The ARB has 60 days from the date of their meeting to render a decision. However, every effort will be made to notify applicants within 5 business days after the decision is made.

How long is my approval good?

For new construction and major modifications, work must commence within one year from the date of the letter.  New construction must be completed within 18 months from the date of the approval letter.  Major modifications must be complete within 12 months from the date of the approval letter.   Minor modification approvals are valid for 90 days and work must be complete within 90 days from the date of the letter.  An extension to these deadlines may be requested by submitting such request to the ARB Administrator in writing prior to the expiration of the approval.

     

Why do I have to pay a review fee?

This fee covers the cost of consulting services for the architect and landscape architect that review each submittal. 
 

Why do I have to pay a compliance deposit?

The purpose of the compliance deposit is to provide the ARB with funds to complete the proposed improvement in the event an owner fails to complete construction of the proposed improvements in accordance with the approved plans and specifications, including the approved landscaping, or fails to clean up the construction site.

When will I get my deposit back?

The ARB Compliance Officer will conduct a final inspection to ensure the project is completed as approved. If there are no outstanding fines, a refund check will be sent to the party who originally paid the deposit.

Where can I get a copy of the ARB Guidelines?

A copy of the Guidelines are available to download using the link above or a copy may be picked up at our office during business hours.  We recommend you also check with your neighborhood association documents as some may have specific guidelines that must be followed as well.